Typical MOQ for solid wood chairs is 50 pcs per model. Sampling takes 7–14 days. Bulk production runs 15–25 days for stock finishes and 30–45 days for custom stain or fabric. Sea freight adds 2–5 weeks depending on destination.
MOQ is the smallest run the factory can produce without losing money on setup — cutting, jig changeover, stain mixing and packing. Below 50 pcs the per-unit cost rises sharply because the setup cost is spread over fewer chairs.
Two things usually flex the MOQ:
A sample chair typically costs the unit price plus air freight, and takes 7–14 days. Some factories credit the sample cost against the bulk order; ask before you order, not after.
When the sample arrives, check four things: joint tightness, seat height against your table, stain colour under your lighting, and whether the finish covers the underside.
| Stage | Time |
|---|---|
| Sample production | 7–14 days |
| Bulk production, stock finish | 15–25 days |
| Bulk production, custom stain/fabric | 30–45 days |
| Inspection and packing | 2–4 days |
| Sea freight, China to Southeast Asia | 7–14 days |
| Sea freight, China to Europe/US | 25–40 days |
Work backwards from the opening date, not forwards from the order date. If a restaurant opens on the 1st of the month and needs chairs installed a week before, and freight takes 30 days, the order has to be placed roughly 10 weeks ahead.
Place the sample order early — even before the design is finalised. The 2 weeks you spend evaluating a sample is the cheapest part of the project, and it is where most costly mistakes get caught.